Hi all, I have a new place that is almost finished and am due to move in around 3 or 4 weeks. When the builders dug the slab, they cut & levelled the whole block and left all the top soil in a big heap in the backyard and poured a floating waffle slab on the ground. As a result, I need to backfill on my block to bring the ground level up to a reasonable height. The builder will leave my topsoil there but are not going to spread it back around.
How easy/safe is it to use a little dingo loader to do this myself? I have never operated one. Will somewhere like Coates hire let me just get one without any prior experience? I would consider myself fairly co-ordinated and can drive a manual car/motorbike no problems, but I have never used a dingo.
How much roughly would I expect to pay?