Browse Forums Landscape & Garden Design Re: deck or concrete slab/ pond 5Aug 20, 2007 9:25 pm I think one day should be enough to get you well on your way.
Cheers, John Re: deck or concrete slab/ pond 6Aug 20, 2007 10:01 pm Quote: We are thinking as well of a greywater pond for the washing machine. I know you should have special permissions.... Not a good idea!!! Greywater should not be stored as it tends to start growing, smelling and becoming a health hazard. Especially in a open pond !!! Grey water should be ideally disposed of - ie watered out as soon as possible - less than 12 hours is ideal. Try it sometime - grab a bucket of your next washing greywater and and leabve it sit around for 2 days - then think about your next move Steve The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5152 yep, clearly mark where the infloor heating pipes are before drilling or nailing 1 6057 Building Standards; Getting It Right! is this for a residential dwelling or a shed? If its for a dwelling, its out of tolerance and a "mistakes happen" isnt a good enough excuse to just move on. 1 2420 |