Browse Forums Landscape & Garden Design 1 Jan 21, 2024 11:26 pm Hi guys, I want to butt a concrete vegetable garden bed against a concrete build up of a carport. It will be a 700mm high wall about 120mm thick and I will run a 12mm rio rod through it. I will be mixing the concrete by hand and will have to do it in 2 pours on separate days so there will be a join in it. If I run the rio rod through the join will I risk the rio rod rusting and end up in time damaging the concrete or should I stop the rio rod 100mm before the join and finish the end of the join not square but with a vertical timber at 45 degrees to create a V to key the cold joint together. Or can someone suggest a better way. Thanks for any input. To err is human but to really mess things up, you need a computer. I have an outdoor verandah where a tile joint along a galvanised steel bracket to a post has started weeping rust. Looking to… 0 9344 They should be run in the frame, when run on the outside the pipes breach the cavity clearance. Most times the brickies mortar will drop on them and dry creating a… 1 7874 As most others have posted above the install isn't compliant. The pipe is meant to be covered in loose soil or sand, the pipe has holes in it that leaks out a termicide… 10 22433 |