hi all,
hoping someone can assist and/or provide some direction.
built about a year ago through a production building company and had landscaping done a short time afterwards, complete with drip systems, etc. (note: landscaping was done by another co.)
cracks were noticed in the brickwork.
i was advised to move the drip system of which i not only moved it, but also shut it off in the area where the cracks had taken place.
6 months later, the cracks are more noticeable, and the building company refuse to repair the damage, saying that the cracks are caused by heaving in the slab which is caused by excessive water in the soil.
can anyone lend any advise as i have done everything as they recommended.