Browse Forums Outdoor Living 1 Feb 11, 2016 10:53 am Post and beam on Left side closest garage This one appears to be correctly installed and is plumb and tightly fitted to the post. http://imgur.com/bvKGF2Q http://imgur.com/UbQBYxR Middle Post and Beam Before http://imgur.com/KXeYBrC After http://imgur.com/21o35Ya It’s still out by 5mm at least and 3mm on the beam nearest the water tank, Glenn used his spirit level after I used my android phone spirit level app “Bubble” as I wanted him to see for himself. Post and Beam nearest Water Tank Before http://imgur.com/ns2EijI after http://imgur.com/YPTGMbb If more bolts are drilled through the post, wouldn’t this weaken that join? The installer is wanting to put two more bolts in adjacent to the existing bolt. Also if the beam is twisted i.e manufacturing defect, then how is putting extra bolts through the post going to rectify this without putting extra strain on the beam? The council have defected the original work and the installer has been back out and I have sent the photos above to the company who are going to do further rectification work along the lines above , they are going to pull the roof off where it joins this 175mm aluminium beam and put two more bolts through same area where it is currently bolted on. Hi All, First time poster. I was hoping to get some advice on villaboard installation within a bathroom. I have installed villaboard before, in a laundry. I think I did… 0 7450 Firstly the ableflex that has been installed needs (manufactures specification) a sealant cap over the top, preventing water draining down between the slab and the… 3 7718 |