Hi everyone
Got a quick question. I have timber floor boards laid first with caesarstone island with waterfall plonked on top.
Builder have left a small gap between the stone and the floor. The builder says they can caulk the gap if I want but they said they usually don’t do it as the caulk will get dirty.
I’m just worried that dirt and water getting between the floor board and the island.
What should I do? What’s everyone else’s kitchen like?