Browse Forums Kitchen Corner 1 Jun 03, 2018 7:10 pm Hi all We are building with Eden Brae and thinking of not doing waterfall edges for kitchen. EBH gave a estimate, for 2K for 2 edges. We thought using that money for something else for now and do the waterfall edges later. Is it possible? Will it be cheaper? Do we have to take some action to now to allow the waterfall edges later? Thanks Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Waterfall edges after handover? 2Jun 03, 2018 9:04 pm InvincibleInDN We thought using that money for something else for now and do the waterfall edges later. Is it possible? Will it be cheaper? Do we have to take some action to now to allow the waterfall edges later? Don't waterfall edges have a mitre join? If so, you would need to have the benchtop ends cut to suit. Re: Waterfall edges after handover? 3Jun 04, 2018 8:34 am arcadelt InvincibleInDN We thought using that money for something else for now and do the waterfall edges later. Is it possible? Will it be cheaper? Do we have to take some action to now to allow the waterfall edges later? Don't waterfall edges have a mitre join? If so, you would need to have the benchtop ends cut to suit. Thanks Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Re: Waterfall edges after handover? 4Jun 04, 2018 7:14 pm You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover Re: Waterfall edges after handover? 5Jun 04, 2018 7:18 pm aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Re: Waterfall edges after handover? 6Jun 04, 2018 7:22 pm InvincibleInDN aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? We are doing our own vinyl planks after handover. We’ll have the stone done first so it can be laid on the hard surface. Re: Waterfall edges after handover? 7Jun 23, 2018 4:30 pm InvincibleInDN aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? You can sit them on tile not a problem Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71773 yes it does, you've just not understood it. theres a difference. 4 5208 Your house should come in "as new" condition. It should be clean, and without stains 1 4550 |