Browse Forums Kitchen Corner 1 Jun 03, 2018 7:10 pm Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Re: Waterfall edges after handover? 3Jun 04, 2018 8:34 am Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Re: Waterfall edges after handover? 4Jun 04, 2018 7:14 pm You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover Re: Waterfall edges after handover? 5Jun 04, 2018 7:18 pm aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? Current State: Slab/Frame/Bricklayer/Lockup/Lining/Stairs/Kitchen/Wet flooring/Painted/PCI/Got the Keys My Thread: Building Windsor 40 with Eden Brae (Caddens) Re: Waterfall edges after handover? 6Jun 04, 2018 7:22 pm InvincibleInDN aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? We are doing our own vinyl planks after handover. We’ll have the stone done first so it can be laid on the hard surface. Re: Waterfall edges after handover? 7Jun 23, 2018 4:30 pm InvincibleInDN aphsta You can do them with a shadow-line joint instead. You’d need the ends to have a 20mm overhang I just had temporary bench tops with my build and am getting natural granite and marble for less than the builders price for manufactured stone after handover I like the idea of having a temporary bench top and replace with the one we wanted. Do they installed the waterfall over the tiles? You can sit them on tile not a problem Not sure, we are doing our driveway during build, our builder MJH has allowed us to get our own trade to do it before handover (lucky in that aspect). But we are still… 2 11291 Hi everyone, I'm currently building a new home with Mimosa Homes, and they expect to complete the lockup stage by early September. I anticipate the home will be handed… 0 2 Hi Need to read your contract about when final payment is received. Clearly outlines what happens. In vic, known defects or incomplete work must be completed before… 3 14403 |