Browse Forums Kitchen Corner 1 Apr 14, 2016 9:40 am Hi All, We have 40mm Kitchen Island bench on the house we are currently building. During the Kitchen costing process we decided that the cost for Waterfall Edges (standard range Ceaserstone) didn't fit with our budget. I wanted to see if Waterfall Edges can be added after installation and approximate costs to fit an island bench with dimensions of 2800(l) x 1100(w) x 870(h). Thanks Re: Waterfall Edges after handover 2Apr 14, 2016 11:23 am Hmmm not a kitchen maker or stone mason but I would have thought that the edges would need to be mitred at the joins and therefore this may not be doable in situ. Hopefully those more knowledgeable than I can comment. Re: Waterfall Edges after handover 3Apr 14, 2016 12:04 pm Pretty sure Tribe on here did her waterfall post handover, can't find her link atm but have a look for her thread, it was a metricon build from memory. Custom build Northern NSW viewtopic.php?f=31&t=72217 Re: Waterfall Edges after handover 4Apr 14, 2016 2:07 pm Yes waterfall edges can be added after handover BUT, You need to have the bench top fitted with that in mind. If they don't leave the correct overhang then it will never work!! Cutting Edge Kitchens and Cabinet Making http://cuttingedgekitchens.net.au http://www.facebook.com/pages/Cutting-Edge-Kitchens/290484196676 Mobile : 0419 430 575 PH: 9452 4772 Fax :9452 4772 cuttingedgekitchens@outlook.com Re: Waterfall Edges after handover 5Apr 14, 2016 3:04 pm Hi All, Thanks for your responses. CEK - we have overhang on 2 sides which function as a breakfast bar wit the other side having a very small overhang (circa 100mm). Would you think this was enough. Re: Waterfall Edges after handover 6Apr 14, 2016 5:47 pm Greg_K . CEK - we have overhang on 2 sides which function as a breakfast bar wit the other side having a very small overhang (circa 100mm). Would you think this was enough. No, the overhang for the waterfall needs to be the exact thickness of the stone. So if its a 40mm thick stone top them you need a 40mm overhang so the 40mm waterfall buts up under perfectly! Cutting Edge Kitchens and Cabinet Making http://cuttingedgekitchens.net.au http://www.facebook.com/pages/Cutting-Edge-Kitchens/290484196676 Mobile : 0419 430 575 PH: 9452 4772 Fax :9452 4772 cuttingedgekitchens@outlook.com Re: Waterfall Edges after handover 7Apr 17, 2016 4:23 am Greg, yes check out Tribe7's thread in the 'Building a new house' subforum. Search for her thread: 'Metricon Gold Coast' (page 152). She was told it couldn't be done and got a top job for $1k Can you give advice on how to get missing certificates needed for a form 21? Our bank requires us to provide one but we are missing 4 building certificates from our first… 3 71736 yes it does, you've just not understood it. theres a difference. 4 5206 Your house should come in "as new" condition. It should be clean, and without stains 1 4544 |