Hi All,
Soon we'll be getting solar panels (PV panels) installed on the roof, and where the panels are going to be installed is where the rangehood vent exits the roof, so we're looking at getting the rangehood vent exit point moved etc.
Has anyone moved a rangehood vent before, and are there any regs as to the maximum angle the vent pipe ducting (inside the roof) can be on to prevent condensation or the sorts?
I haven't been in the roof as yet, but I do know that there's sarking under the concrete roof tiles.
If I can find the relevant bits at Bunnings I'd be happy to do it myself, unless it need to be moved by a licenced builder/plumber.
Any ideas?
Thanks