November 4th, 2009:
Well guys, kitchen nearly finished. Electrician damaged laminate surrounding a downlight so just waiting on a replacement piece of bulkhead for above the sink, then a mirror goes in to cover all that brickwork and another shelf, you can see the holes drilled for where it will be.
Very happy with results, all went pretty smoothly and it has been worth the wait. Looking forward to cooking Christmas dinner this year! Will post more photos once completed.
December 6th, 2009;
PS, Bear with this post, I put pics on and then took them off, but have since posted full photos on Page 2 so scroll through if you want to take a peak at the end result, bulkhead, mirror etc all done.
PPS for those interested;
Benchtops; Ceasarstone Ice Snow with 40mm edges
Splashback; Rococco Glass tiles 30mm x10mm "Night Glass"
Flooring; Satin finish polished Myrtle floorboards
Cabinets; Laminex Polar White, matt finish
Feature Cabinets; Polytec Shannon Oak, matt finish
Kickboards; Laminex Polar White
Bulkhead is Laminex Polar White with rolled edges, as is shelving