Browse Forums General Discussion This was on google. Development controls 2.3.1 Front setback D1 New buildings within residential areas shall adhere to a front building line, which is 5.5-6m to the… 1 3674 Hi Minho I have heaps of experience in Ku-ring-gai with both DAs and CDC ( this is the main area we build in). DA's are taking 12-18months and CDC's we have been doing… 1 3165 Hi All, see above image. The required setback from the rear boundary in my case is 5m, as you can see the shape of the site and location of the boundary is slightly… 0 8461 |