Browse Forums General Discussion Re: adding extra costs at end of build??? Can they??? 8Dec 01, 2008 1:06 pm The frieze tiles were all planned for, they made a mistake in the quantity, but its proving to be near impossible to get reimbursed.
We may have to take Pry Hms to the courts as they have really taken us to the cleaners on so called extras. Ask the council if there is a chance of getting build over easement exemption. Sometimes easements are unused and 24cm is not all that much. Good luck. And yes any builder… 2 13775 Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2130 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 3851 |