Browse Forums General Discussion Re: how to go about hooking into subdivision sewerage 3May 13, 2020 2:48 pm cupcake.girl Hey, I have been wanting to subdivide my block for a while but couldn't because we are on a septic tank system. A development has recently been approved behind out place with the sewer line proposed to run behind the back of our block. Does anyone know how I would go about connecting into that so that we could then apply to subdivide? I don't even know where to begin with this! Thanks What council area are you in I use Tramex moisture meter and it will tell me instantly if the wall is cement sheet or plaster or masonite but most people dont have the equipment. 5 7086 the step up is 30mm and wanting it to be flat . how much does the concrete have to be lowered .we plan on removing bath and lenghten shower and adding seat. the old bath… 0 11835 8 6138 |