Browse Forums General Discussion 1 Jan 08, 2020 11:33 am I had entered into a building tender 20.04.2018 which has expired. Changes have been made to the internal and external as satisfied with the original one. Have a new tender as of 5.11.2019 and the builder had not been honest with costing. Can I terminate the tender and gain my deposit that I made in 4.2018? Hi All, I engaged a tradie to install concrete retaining wall 600-800mm high over 32 meters in Victoria. Sleepers are 200*75*2000 mm installed over 17 steel posts. I… 0 3735 Building Standards; Getting It Right! Don't think they are designed for double brick. WA has a particular way of building and unfortunately that's the way a large amount of sills are finished. 3 4733 Versaloc is a mortarless besser block system that still needs a properly engineered footing. If you just do a 400x200 footing it will fail in time. At 17m long you need it… 1 3456 |