Browse Forums General Discussion 1 Nov 10, 2019 4:22 pm I’m currently installing yellow tongue noggins for a garage door based on nog maps from my garage door supplier. The required dimensions of the noggins obviously do not line up neatly between the joists. Do I need the yellow tongue to span fully from joist to joist (i.e. does it need to span across three joists), or can I do it so it only spans across two joists and has an overhang on one end? Hi guys, I want to do some floor levelling before laying the planks and am considering doing it with self-levelling or yellow tongue PB board. I am wondering which one… 0 3926 Dover white or surfmist garage door. I am having trouble choosing a garage door. The outside of house will be tranquel retreat. I want it to all blend nicely however I… 0 4866 |