Browse Forums General Discussion 1 Apr 20, 2019 2:53 pm Hi guys, Been lurking around for a while and soaking up all the info that's available on this website. It truly is a wealth of information! Bit of background. My partner and I have just purchased 10 acres just out of Bendigo VIC and are going to be building in the next 18 months or so. The block currently has a double garage installed on a concrete slab on the corner of pre-existing building envelope. There are no services currently to the envelope (water and gas not available). My question is, there is power to a pit in the corner of the block (about 200m from the envelope). I'm happy to dig the trench for the sparky to run-in the cable, but until we build a house, I'm wondering whether there's any reason we can't run the main cable to the shed and install the power meter on the shed? And then when the house is built, dig a short trench to the house and install a main circuit board where the power meter would otherwise be? My reasoning is so that we can have power to the shed until the house is built there? Cheers! 7 6251 I had a similar issue with my fridge not too long ago. It wasn't the same model, but the symptoms were pretty much the same: the compressor would start and then stop… 3 7540 Is it possible to render an old corrugated iron shed.I have heard that it can be done if it is covered with chicken wire first.Not sure of the ratio of the render mix and… 0 4896 |