Browse Forums General Discussion Re: Alfresco a few metres off ground level 3May 30, 2019 8:26 am Hi Karolien123 Here, you will need to make adjustments to the design The Council may also require engineering Drawings Projects to do after handover hth Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Hi guys, I want to do some floor levelling before laying the planks and am considering doing it with self-levelling or yellow tongue PB board. I am wondering which one… 0 6529 Hi everyone, Looking for some advise. We are about to build an above ground pool in our backyard. There is a private sewer line running under the pool at 1.6m… 0 11731 Hi, I'm new to this forum so I hope I'm doing this post correctly. Please advise if it's not. I've just bought my place. The inground pool has a marble lining that has… 0 13657 |