Hi Guys,
I have a vacant land was initially 0.8-1 meter slope from front to back. The next door was a vacant block too. Now the neighbour started with preliminary works for house construction. They increased the bench level almost a meter above the initial bench level with rubble and soil. Does anyone have any idea how much will it cost if we have to raise the ground level upto a meter. Thanks