Browse Forums General Discussion Re: Knockdown Rebuild 2May 09, 2018 10:08 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Knockdown Rebuild 6Jun 29, 2018 6:09 pm My build with Inspired/ Como Homes:Â https://forum.homeone.com.au/viewtopic.php?f=31&t=93656 Re: Knockdown Rebuild 7Jul 10, 2018 8:25 am You also need to consider that volume builders have a maximum fall that they can build on. I think it is a maximum of maybe 2 to 3 meters. Any higher than that then the volume builder won't be able to build on your land. Also, factor in the demolition process, from installing an electricity pit if you have overhead powerlines to the actual demolition. This is a process unto itself and it takes several months as well as it adds to your costs. if the original house is in good condition most of what you listed could be added in stages without the need for KDR and costs and disruption of having to live elsewhere… 1 13658 Hi We have finally decided to complete a KDR on our corner plot in NE Melbourne suburbs. Given its a corner plot approx. 400 sqm just a standard design may not fit the… 0 8550 multiple occ properties are always billed by trades at a premium, rarely per sqm for the lot. You either have trades you know whoe will do by sqm or youre going to get… 1 2185 |