Browse Forums General Discussion 1 Mar 15, 2018 6:27 pm We live in a building that still has the old ceramic fuses to the majority of units which I realise are now non compliant and no electrician will do any internal work before the corresponding fuse at the box is replaced and bought up to standard. With that, I decided to get some quotes to replace the whole board of 12 units. I got two quotes but they were completely different with one being at least double the price and far more extensive works. The question is whether the added works in Quote 2 are necessary or merely unnecessary. Quote 1 Replace asbestos panel with new panel and use existing metal surround Replace all ceramic fuses with circuit breakers Install safety switches on power. $6600 Quote 2 Supply and install 1 new main earth system Supply and install 1 set of service protection fuses Supply and install 1 new 100 amp main isolation circuit breaker Supply and install 1 new package board complete with safety switches and circuit breakers for units 1-12. Supply and install 1 new package board complete with safety switches and circuit breakers for the common area Extend all final sub circuits to suite the new switchboard enclosure Refit existing electricity meter to new switchboard panel. Supply and install new hinged panels to house all new package boards Supply and install fire rated sealant to the cable entry and exit points $15,000 app Hi All, see above image. The required setback from the rear boundary in my case is 5m, as you can see the shape of the site and location of the boundary is slightly… 0 8453 Just be careful with building stability during construction, that is when the structure may be weakened, refer to your engineering drawings for stability methodology. 1 7226 Can anyone recommend a good/affordable retaining wall and fence builder that I can get a quote from located in Sydney? 8 45817 |