Browse Forums General Discussion 1 Nov 17, 2017 11:55 am The plumber has completed his entire roughin for the entire home and I have noticed his has installed the main plastic yellow gas line and main water line in between the brick work and timber frame (vapour barrier) not sure if this practice is allowed? We're can I ascertain further information before I ask the question with the builder? Hi, I had a barrier reef pool installed less that 2 years ago and the gel coat is already fading. The colour is electric grey shimmer which isn’t available… 0 2661 I’m not a structural engineer but I’m free. you still need an engineer for the plans. I only have part of your plans, but you seem to have a 850mm drop from the side… 3 7710 Hi JW I just read your post and I find this situation quite strange. When we build, we get a temp pole for construction which becomes the permanent pole for one of the… 1 3208 |