Browse Forums General Discussion Re: Do you really want to build with someone who doesn't all 2Oct 20, 2017 12:38 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Do you really want to build with someone who doesn't all 3Oct 20, 2017 1:20 pm 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Do you really want to build with someone who doesn't all 5Oct 20, 2017 1:38 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Do you really want to build with someone who doesn't all 6Oct 20, 2017 1:54 pm 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: Do you really want to build with someone who doesn't all 7Oct 20, 2017 7:00 pm rum_home I'm with Metricon, and the contract experience appears to be similar to yours. I've been given the same sample documents, which didn't line up with what they said they've sent, and no explanation of the process. I've written back to them, on Monday, about my access and time to review prior to contract signing and other questions relating to building inspectors. I've yet to have a reply. They too seem to have a very scripted conversation and only stress the need to sign and be present for appointments and such, but no real customer care or ownership of the education of the client. I find it strange, and not sure how legally binding, they can force you to sign a document without legal representation. I know I'll be wanting my conveyancer to review it prior to me signing. I've asked about the two methods of payment schedules too, which no response on. As method 2 seems to front load a lot of the payments beyond the normal HIA schedule of payments. Yeah, Metricon has the regular 40 homes at discount limited offer too. But it's 40 homes per sales office and isn't as limited as it sold. SaveH20, yeah that document sent by my CSR wasn't properly explained and I've asked about that too. Our full contract with full pricing was available weeks before our contract appt with Metricon. There was no way we'd have signed otherwise. Re: Do you really want to build with someone who doesn't all 8Oct 24, 2017 9:15 am tks for the info. this is the right way that it supposed to be do not pay until you are satisfied with workmanship windows require flashing over the head archithrave and up under weatherboards 3 28260 I would be wary. Is you site demilished but nothing else done? Sounds like liquidity problems to me. Our builder did the same. Got hundreds of thousands of dollars of… 2 15390 Sounds like rubbish to me. Ask for the contamination report which I doubt they have. If it's part of a normal subdivision it would have had a contamination report done… 9 5641 |