Browse Forums General Discussion Re: Progress pictures but what I don't understand... 2Jun 04, 2017 10:54 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Progress pictures but what I don't understand... 4Jun 04, 2017 2:44 pm Spooky8080 Yeh. The close proximity to the ocean meant all building materials were upgraded to marine quality and roofing is ultra marine. spooky8080 Upgrading the materials for durability is one thing, installing, placing & fixing as per the Codes & Standards is yet another No-one remembers what was done 2-5 years down the track after its buried, covered, tiled over and forgotten till something goes wrong at which point it is too late. As an engineer/contractor that does structural repairs I can't stress enough how important it is to inspect, take photos & have them properly checked beforehand. Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs the sun master is the solar heating to "warm" the water in the tank the S26 is your hot water system which will heat the water (25 degrees?) so with both turned on you… 2 12429 Regardless of wall hung toilet or floor pan toilet your feet will be right on drain, seems to me the waste should not be in that location given the design. Also are you… 6 7028 8 6119 |