- 1.Wait for the certificate, which as E-Lite assures me, is coming shortly. But I'd like to start as soon as possible, to be able to finish by next April/May and bureaucratic "shortly may mean a year
- 2. Build the garage from some fire-proof stuff (bricks, Durisol block, etc) and the rest from the panels. But that will complicate building, by having 3 different materials (and 3 trades) for the walls, not to mention costs
- 3. Build whole house from reverse brick veneer (it's an option anyway). But how the RVB will be fireproofed for the parapet walls ??
Any advice, comments, etc ??
Chris