Hi There,
We recently settled in stage 6. Soil test revealed 15 Metres (More than 50 feet) of fill. Site costs are working out to upwards of 100K.
Have any other come across similar situation with soil test and site cost.
Browse Forums General Discussion Re: Mirvac Harcrest Wantirna Stage 6 - Site Costs and Fill 5Jul 11, 2016 7:48 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Mirvac Harcrest Wantirna Stage 6 - Site Costs and Fill 15Sep 16, 2016 10:59 am Hi greenapple if it's a geo tech firm that builders use all the time then 1. Site reports are generally written the way builders want them to be written..some comprehensive ..some not? 2. IMO you are paying for it so you should be able to contact the report writer and ask for additional info 3.The footing details options will be designed by a structural engineer based on the site report..and the builders preferences please leave a pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Versaloc is a mortarless besser block system that still needs a properly engineered footing. If you just do a 400x200 footing it will fail in time. At 17m long you need it… 1 15243 I am not sure whether Perth has its own way of doing things in regards to this. Most of Perth has class A (sandy soil), except for some areas near rivers or hills. 2 12989 Is anyone building with Mojo and have a recent site cost tender 0 15907 |