Browse Forums General Discussion 1 Feb 16, 2016 7:53 am Acclimatising timber 13Feb 18, 2016 4:55 am Jack Williams laying a solid wood floor is a job that can quite feasibly be carried out on a DIY basis, but obviously not everyone has the time or inclination to do this. If you want to get someone else to lay it for you, you’ll need to ask either a builder or local carpenter or joiner to do the work. Some suppliers can also recommend specialist floor fitters. When your flooring arrives, you must let it acclimatise to the room before it is laid. Some types of flooring should be left in their packaging while they acclimatise, but others need to be removed, so ask your supplier for details. The supplier will also be able to tell you how long you need to leave them — some only require 24 hours, others may need longer. When you are laying a solid timber floor, it is best to lay it using a fixed method, as opposed to ‘floating’ (commonly used for engineered boards). This is because solid wood flooring has a higher tendency towards movement and needs to be fixed to the subfloor to avoid problems in the future. You can fix it to concrete, to the floor joists or to an existing timber floor. If fixing to concrete: ensure the concrete is sound and level. If it’s not, then screwing a chipboard or plywood subbase on top, then nailing or gluing the new wood floor to it, is the best way forward. If you are fixing the floor directly to the concrete, gluing it down is the way to go. You might also take a look at some of the self-adhesive membranes out there, but beware, they are incredibly sticky and once the wood is stuck to the membrane, it is near-impossible to remove. If you are fixing solid wood flooring to existing timber: nailing will be the best option. Although it is good to lay the new board at a 90° angle to the old, it is not imperative. That said, this is essential if you are nailing directly to the joists. Because you are likely to be fixing your solid wood boards to the subfloor, underlay is not usually used, but there are slatted underlays you can buy for the purpose, with pre-cut slots that allow the floor to be glued directly to the subfloor (try Acoustalay Slatted Glue Through Underlay, available from Screwfix). Before beginning work, skirting boards should be removed to achieve the neatest finish. Some homeowners do, however, choose to leave skirting in place and use quadrant beading to cover the gap between the floor and skirting. Most solid wood flooring comes with tongue-and-groove edges and can be either glued or secret nailed, but before you begin, remember you will need to leave an expansion gap around the walls of around 15mm to allow for movement. You can pick up plastic spacers to do the job for you. Depending on the size of your room, it should take around two to three days to lay wood flooring, although it has to be said that laying a fixed solid floor is a more time-consuming task than installing engineered wood. The results, however, speak for themselves. Step-by-Step 1. Acclimatise the boards and decide which direction you are going to lay them in. If you are fixing them directly on to the floor joists, they will have to run at a 90° angle to them. Remove any inward-opening doors. 2. Remove the skirting boards using a crowbar (place a wooden or cork block between the wall and crowbar to avoid damage. 3. Vacuum and clean the subfloor and, if using, cut and fit underlay. 4. Position plastic spacers along the longest and straightest wall. 5. Fix the first row of boards — if the boards have tongue-and-groove edges, ensure the groove is facing the wall and start from a corner. Nail or glue depending on how you have decided to fix the boards and remember that the expansion gap will need to run around the edges of the entire room, including at the ends of the boards. 6. Lay the second row starting with the section cut off the board at the end of the last row you laid. Stagger the end joints of the adjacent rows by around 30cm. You can buy fitting tools to push the ends of the boards together. Work your way across the room, tightening each joint with an edge block. 7. When you get to pipes, mark the position on the board that is being laid around it, drill a hole about 5mm larger than the diameter of the pipe, and make two saw cuts running from the edge of the board to the sides of the hole. Fit the board into position and glue the off-cut piece of wood back into place behind the pipe. 8. When you get to the final row, you will probably have to cut along the length of the boards. Measure the gap between the boards and the wall, deduct 15mm and saw the boards to fit. Fix the joints and force into place. 9. Refit the skirting, or fit new. Our Estimate Two to three Days Cost: DIY or £300–500 (labour) Engineered Timber Flooring Many people these days opt for an engineered timber as opposed to solid. It is more stable than solid timber and therefore far less prone to movement. It is made up of a layer of solid wood, bonded to several layers of softwood and comes with tongue-and-groove edges that can be clicked together without the need for nailing or gluing. It can be laid as a floating floor, over your existing floor (timber, concrete, tiles — you name it) and is designed to be used with an underlay. The better the product, the thicker the solid wood layer on top — which is particularly important if it needs sanding to repair any patches at some point. Thanks for your reply. Hell no I'm not laying it myself. I'm just wondering because our blackbutt floor is currently sitting in a stack in the corner of our new build. I remember when my parents had one laid the carpenter was very particular about placing it all down flat and it was there for about two weeks. It's always been what I wanted in the house and I want to make sure it's done properly.. Custom knockdown rebuild Newcastle NSW viewtopic.php?t=78271 Engineering timber is certainly a less fuss option, times cheaper to supply and install and better withstands humidity. 1 15905 Thanks Simon, I guess I'm no concerned with the volume of the noise rather that dead and hollow sound and feel that is associated with floating floors. But I'm not sure… 3 6134 The most likely cause of your timber swelling (parquetry?) is either a plumbing leak or carelessly leaving water on floors after use or both. Without seeing, i am ignoring… 1 3276 |