Hi all, we have a pipe under the concrete to allow water and electrical access to the island bench in our kitchen. After the cabinet maker did his measure up he noticed the pipe was 100mm short of where it should be so now the open pipe will sit roughly underneath the first tile next to the island bench. The builder asked if we would like to make the kitchen narrower to hide this beneath the cabinetry or have the concrete dug up and extend the pipe. We opted to have it moved because we did not want to take any more space away from the kitchen. So after going back and inspecting the repairs, it appears they have done a simple bodge job by placing the water pipes under the concrete so it can be tiled over, is this common or even allowed?, should there ever be a problem with the pipes it will cost a ton of money to repair in the future. Can someone please chime in with some advice, I don't really know where I stand with this?
There is also some pics of water around the slab which I have asked to be rectified.
http://i1204.photobucket.com/albums/bb402/jasgofast/image6_zpsmsoa43tp.jpeg
http://i1204.photobucket.com/albums/bb402/jasgofast/image5_zpsg56kccgm.jpeg
http://i1204.photobucket.com/albums/bb402/jasgofast/image4_zpspkumwwed.jpeg
http://i1204.photobucket.com/albums/bb402/jasgofast/image3_zpspkqasjuc.jpeg