I am building with a bulk builder and has realised that the building works were on "auto-pilot" and badly supervised. Basic things like the position of the windows were wrong and the bricker failed to install a control/expansion joint. No one noticed until we pointed it out to the builder.
This makes me worried about other things which were not built according to plans but could not be checked because the plastering are already up.
Has anyone had this bad experience?