I am just wondering, is it normal for builder to move the location of light switch from where the client specified?
I have my entrance door light switch moved from an optimum location (right besides the entrance door) to a more inconvenient location (to the wall behind the door) - the reason they stated is that it is a load bearing stud wall (column) that cannot be cut - but our plan is exactly the same as display home which has the light switch where they should be. Its quite infuriating to find nasty surprise like these happen and I am just wondering what are my options.
Thanks!