i called a bricklayer,and was told its not a big problem...but if the floor move i'd have to lift the floor and rebuild the piers

wat makes it hard is that the area under the extended floor (where the piers area is so small to work in,
so basicly i need to strengthen my piers rite?
what do i need to do?