So what are you saying causes the heave when a concrete path is present around the entire house?
I really can't see a 900mm path stopping a great deal of moisture. If it was so simple why don't builders save a lot of heart ache on all sides and pour a path around the house? Would add very little cost, especially on a class P site where added measures are needed.