Browse Forums General Discussion Re: To Spec or not to Spec.. 3Aug 19, 2006 12:21 am Quote: I would ask the local builder to build to the same level of a Spec home. But to my design. If you want to save money and have a limited budget then go with a large volume builder and don't change anything. Otherwise, be prepared for a significant jump in cost. The HIA contract, in the term & conditions section states that "Commencment" is deemed when the drainage is started or the piers are dug or the slab is formed up (incase… 2 6182 DIY, Home Maintenance & Repair But if it is a ground level open pit, then it is not a charged system. No surprises there. The pipes have obviously been altered and there would be a reason for this.… 3 31284 I work with owner, he/she is my man on the ground and I instruct them when to visit the site and take photos and I have other tools in the bag. 4 15284 |