Browse Forums General Discussion Re: Provisional sum of $3,000 for double handling. Proovable 2Mar 22, 2012 8:47 am Some people apparently have nothing better to do than comment on other people's sigs. Re: Provisional sum of $3,000 for double handling. Proovable 4Mar 22, 2012 11:16 am Some people apparently have nothing better to do than comment on other people's sigs. Re: Provisional sum of $3,000 for double handling. Proovable 5Mar 26, 2012 5:41 am As professionally trained Quantity Surveyor I can tell you that Standard Method of Measurement of rock is in the solid (not when it is broken up and loose). When excavated, rock and soil increases in volume sometimes more than 50% and you will be billed (wrongly) for the extra volume. I would shudder to think how many people have been ripped off in ignorant bliss. Think twice and get building expert advice Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog You talk about deletions, are they variations or PS and PC adjustments? pleas list them 1 11992 That sucks! Hope it all works out. Good to move away from steel anyway for all your reasons, but it's also thermally poor. 16 13717 id suggest getting an engineer to give you an opinion rather than a builder. 1 11894 |