Browse Forums General Discussion 1 Jul 30, 2011 4:09 pm sewage lines???? We have retained most of our block and the new levels will be approx 600mm higher than now. What I want to know is with the inspection points can I just cut off the concrete inspection point join some sewage pipe togeather and replace the IP? If I can't it will be approx 600 below soil level. Thanks for your replies. PS: we are in Logan-Brisbane if that helps. Re: are you allowed to raise inspection points for.... 2Jul 31, 2011 4:41 pm I suppose you are supposed to get a plumber to do it. But I did just as you describe myself. The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. ok thanks - yes was wondering if that should have been listed as Option Three! 2 7712 i had the my concreters concrete right up to the fence. I have pits all along my path, so the water tends to drain away from the house and into the pits. There's only one… 7 12718 If you're referring to Eufy homebase, then just put a switch between a datapoint and put the homebase elsewhere near another device in your home unless you want teh… 9 13838 |