Just wondering those that are in WA (or anywhere with double brick) did you have much cracking when it came time for your maintenance inspection?
Our builder does a 4 month one which is due soon and just going through the house, we only have a couple of minor hairline cracks, so pretty happy with that and hopefully that's as far as they go.
Our rental that we were in thought, that had massive cracks in pretty much every room and it was a new house too and is literally up the street from our house now.
I know these cracks are normal and a part of settling, so not bothered by them, but just wanted to see how other double brick constructed houses faired. We have built twice before but both were brick veneer, so this is all new to me