Browse Forums General Discussion Re: Difficult neighbour - advice needed 3Jul 27, 2010 2:02 pm Metricon Riva 33 - http://herlihy-riva.blogspot.com Site start 15/03/2010 - Handover 23/12/2010 9 months and 8 days (284 calendar days) from site start to handover Re: Difficult neighbour - advice needed 13Jul 29, 2010 3:13 pm Quote: zion - unfortunately council are not providing us with any assistance or support on this one This could be your platform to launch your appeal.Health and safety regulations,partial access etc etc.You cant complete the repairs safely without partial access. Here is a situation.You are doing repairs on the boundary line , somehow an accident happens and you are ****** on the other side of the boundary.Your work cover ,insurances etc need to be adjusted and include that there is a risk factor pertaining to the other persons property. By the Law, there must be requirements meet, forms to fill out and possibly insurance money to pay.If its done in order and by the Law , then your neighbor must submit to the Laws and rulings, and you now have access legally. Re submit your investigation using this platform.Dont mention your problem neighbor either. Hi All, I engaged a tradie to install concrete retaining wall 600-800mm high over 32 meters in Victoria. Sleepers are 200*75*2000 mm installed over 17 steel posts. I… 0 6889 Building Standards; Getting It Right! Don't think they are designed for double brick. WA has a particular way of building and unfortunately that's the way a large amount of sills are finished. 3 6996 Versaloc is a mortarless besser block system that still needs a properly engineered footing. If you just do a 400x200 footing it will fail in time. At 17m long you need it… 1 15694 |