Hi everyone, we have had 2 site tests on our block. We were originally going with AVJ (but decided not to proceed in the end) and it was noted on their survey that a M-D class slab was recommended (waffle raft). They only dug 3 holes on the block.
We are now proceeding with Henley so they too have performed their own site test, digging 5 holes on the block and we are waiting for the classification. We were originally told that it might be a P class slab as there were originaly some trees running down the LHS of our block. We are not sure of how large they were as all were cleared beforehand. So we are not sure how much to allocate for the site costs. We have enerything else covered, but it is always the unkown.
Just heard from Henley and they have classed the site as a H???
Does anyone know if there is any differene between a standard M class and an M-D class slab?
Or alternatively does anyone have any costly slab stories?
What sort of price diff approx in an M class VS a H class slab.
I know we will have to wait till tender to find out costs for certain, but if anyone can give me a heads up i would appreicate it....