As owner builders we basically have a clean slate to work with for our electrical plan. I know about ensuring we have phase 3 cabling and we have requested cat5e cabling running to each of the data points in our house and have planned to have conduits running to the front and back for future electrical provisions. But what else should we be looking out for with regards to type of wire used, using different circuits for different parts of the house. Any tips or things we should look out for?
thanks
helen