Browse Forums General Discussion 1 Aug 19, 2009 9:58 pm We have just been told by our builder that council(ipswich) need us to get a Hydraulic Engineering design as we have too many fixtures (2 too many) has any one else come across this problem, I understand that it is need to make sure water pressure is good but it just seem like another grab for cash from the council? Frustrated with red tape Lou http://take2-customdesigndownslope.blogspot.com 07-10-09 omg they have cut the block 14-05-10 we finally have the keys Assuming you've modelled the TB8, TB10, TB12, TB2 & J1 joists/LVLs there, it appears as per drawing to me. There maybe should be an additional J1 between TB10 and T12 if… 3 31820 Thanks for all replies. I just noticed now the pictures I added to post right on top of page were wrong. I attached pictures showing "current" and my "suggested" floor… 9 14644 Thank you so much for the effort. We will use it to talk with builder. We also had idea of building duplex instead and seeking suggest ions. viewtopic.php?f=31&t=106744 11 13833 |