Browse Forums General Discussion Re: Cancelling before contracts signed. 2Aug 10, 2009 1:20 pm Building with Homebuyers Centre El Questro! My building thread..viewtopic.php?f=31&t=19421 Brickies started 5/10 Re: Cancelling before contracts signed. 5Aug 10, 2009 1:45 pm Building with Homebuyers Centre El Questro! My building thread..viewtopic.php?f=31&t=19421 Brickies started 5/10 Re: Cancelling before contracts signed. 7Aug 10, 2009 3:10 pm Building with Ventura homes (WA) Building thread: viewtopic.php?f=31&t=20516 Slab: 17/04/10, Bricking started: 12/05/10, Bricking finished: 2/06/10, Roof frame done: 11/06/10, Colorbond on: 14/07/10, Lock Up: 19/08/10, Cabinets: 25/08/10, Tiling done: 28/09/10, Electrical: 2/10/10, PCI: 29/10/10, Keys: 4/11/10 MBA and HIA both have sub contract agreements, check them out 2 7327 Industry type domestic contracts are prepared by industry bodies for the benefit of the builders. This means that if you are the owner watch out. One of the points is… 0 3235 I am in the same situation, would you be able to give some insights in to this? I am in SA 8 17063 |