Browse Forums General Discussion 1 Jul 23, 2009 4:36 pm Deposits paid 29/4/09 Land settlement 12/08/09 Build contract signed 24/08/09 Colours done 28/09/09 BLOG-http://www.eljaysbuild.blogspot.com/ Re: Oh no! Does this spell lots of rock costs? 3Jul 23, 2009 7:32 pm I really really hope this doesn't mean more money *fingers crossed* Deposits paid 29/4/09 Land settlement 12/08/09 Build contract signed 24/08/09 Colours done 28/09/09 BLOG-http://www.eljaysbuild.blogspot.com/ My land is 260m2 (10m x 26m) located in claymore NSW. Under campbelltown council. I know in general the following setbacks would apply ground floor side setback =… 0 6927 Hi all, I have been looking at land in South Australia, that is on a slope however most of the core excavation is complete, with a flat area to place a house. The agent… 0 1410 I've just built 3 stairs off a landing out the back and been told by the private certifier I need hand rails sorry tried to attach a pic but couldn't mine don't have sides… 5 5710 |