Browse Forums General Discussion 1 Jul 04, 2024 10:06 pm due to no side access 350mm each side and impossible to get machines in I am wanting to change plans from bored piers to strip footings, Site S, Soil S class. lounge room extension 9m x 6m , spantec steel flooring system timber frames trusses, tin roof. We will dig footings by hand Re: Change approved plans from bored piers to strip footings 2Jul 05, 2024 5:50 am Make sure you have the required soil bearing capacity at the shallow founding depth and the strip footings are designed for the expected loads over (including the wind and posts loads if any) Your structural engineer should be able to advise you on those issues. Shane It might be best to talk to your structural engineer to see how deep you need to go, because normally once we hit rock or refusal we stop and you don't need to… 3 2388 If your patio is going to be 35 sqm then that's going to need Council Approval. The fact that they previously approved your 25sqm patio will be irelevant 1 7553 3 3776 |