Browse Forums General Discussion 1 Aug 07, 2023 7:35 am We've had decent weather for last 7 weeks and now the drvieway has been cut out we had an evening of 50mm of rain including all the water from half the street, ground is drenched and bottom of drivewsay before stepping in to garage is water logged. Will this whole area, especially bottom need to dry out before final driveway prep and concrete pour can occur? It will be neat but you won't have much freeboard. At least they are not weep holes. Are you in a high intensity rainfall region? The regulatory slope is only required… 3 8293 Just get as close as you can without hitting the posts. Once you are close to the edge of the path the chance of cracking is minimised. 7 9199 To my understanding early saw cuts are to control shrinkage cracks, so doing them now would be pointless. Control joints may reduce ugly cracking during periods of soil… 3 9870 |