Browse Forums General Discussion 1 Aug 07, 2023 7:35 am We've had decent weather for last 7 weeks and now the drvieway has been cut out we had an evening of 50mm of rain including all the water from half the street, ground is drenched and bottom of drivewsay before stepping in to garage is water logged. Will this whole area, especially bottom need to dry out before final driveway prep and concrete pour can occur? It will be neat but you won't have much freeboard. At least they are not weep holes. Are you in a high intensity rainfall region? The regulatory slope is only required… 3 8394 Just get as close as you can without hitting the posts. Once you are close to the edge of the path the chance of cracking is minimised. 7 9230 Hi all I need a guidance on how far I need to space expansion joints in the concrete driveway and its type (keyway/foam.) Contraction joints are at 3m max for a 125 slab. Thanks 0 11050 |