We were currently building with the above. The build is way too long. We got called for final inspection but there are still stuff needing to fix yet they are very quick to send us invoice which says due in 4 days ( final progress Payment). They also have not received the certificate of occupancy which was one f the requirements my bank wants to receive.
The tin roof capping from the granny flat needs to be secure as it needs to be screwed down.
2. Ceiling section from the garage have 1 hole due to incorrect hole made when they installed the electric door.
3. Wardrobe door in the granny flat bedroom is not yet installed.
Apart from the restrictor that certifier have failed on the downstairs window,
downpipes on the side are sitting above ground still need to be fix,
some painting on the granny flat”s laundry door still need to be fix.
Some Window upstairs are missing.
Outside cornices to the
Entertaining area also was pointed out to Scott that needs fixing (pointed out to Scott on during our appointment)
Upstairs soap disc not installed yet.