Browse Forums General Discussion 1 Apr 21, 2022 5:00 pm Hi guys, Need suggestions on couple of issues:- 1) There was an electrical conduit that left at the Kitchen island bench, which I believe was laid by the sparky. This has been poured over during the slab pour yesterday. So, no electrical conduit is coming out of slab now. What is the solution for it now? 2) While pouring the concrete for the slab, guest ensuite shower waste level was bit lower than the slab level. The slab guy has added a PVC pipe bell piece to the riser pipe but not applied the PVC adhesive to join. Obviously, it may cause the water leakage issues in the future. Can that be fixed? If so, how? Looking forward for the answers from experienced peeps out there. Tnx - Vin If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4480 In my experience roof is essential element of the building envelope and hence a common property and should be covered by owners corporation however a detailed review of… 3 6169 For anyone that comes across this issue in the future - Just did what aussieta said and found a plumber to inspect it and sign off on it. Was difficult to find someone to… 3 7034 |