Browse Forums General Discussion Re: Screw piling chosen without the geotech report 2Oct 17, 2021 6:25 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Screw piling chosen without the geotech report 4Oct 17, 2021 10:00 pm Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Screw piling chosen without the geotech report 7Oct 18, 2021 9:11 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Screw piling chosen without the geotech report 9Oct 18, 2021 4:15 pm Architectural Homes & Duplexes - specialising in custom designing homes to your budget Get a Free Onsite Consultation Today or send a PM for information, questions or advice. Re: Screw piling chosen without the geotech report 13Oct 18, 2021 4:59 pm Architectural Homes & Duplexes - specialising in custom designing homes to your budget Get a Free Onsite Consultation Today or send a PM for information, questions or advice. Re: Screw piling chosen without the geotech report 14Oct 18, 2021 5:01 pm Architectural Homes & Duplexes - specialising in custom designing homes to your budget Get a Free Onsite Consultation Today or send a PM for information, questions or advice. Re: Screw piling chosen without the geotech report 16Oct 19, 2021 4:45 am Ashington Homes Savagepuppy boris594 Without meaning to defend the she'll-be-right-mate attitude of many builders who neglect details when talking to customers, I was wondering why specifically would engineering detail affect the CDC approval if the CDC approval doesn't have engineering details on it? Without knowing any better, the builder and architect could be correct in this instance, technically speaking Hi Boris, I’m not sure if you are right about cdc approval doesn’t have engineering details in it. That’s something I need to find out, but I’d assume it does as the architect has been waiting for structural plan and stormwater plan to finish, then told me that we are ready to submit. I will find out. Cheers, Judy Structural drawings get stamped as part of the approval along with Hydraulics, landscape, basix etc I thought so too, thanks for the clarification. If what you describe is correct then the brick wall has been dry lined with villa board. That basically means that the villa board is glued to the brick wall with… 3 8317 This certainly doesn't look good. I would be engaging with an independent inspector to have a look at this. As for the unscheduled site visits, most builders are quite… 1 28326 Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 20921 |