Hi guys,
We are currently at the framing stage. I drove pass the site today and found out a strange thing. The guys add bit more concrete by hand on the front side of the existing slab. To me it seems because the concrete has already poured is not long enough for the frame. So they must add some more so the frame is not sit in the air. See the photos.
Anyone have the similar situation? Or my assumption is wrong?
Thanks!