Browse Forums General Discussion Re: Trick in the contract by Dale Alcock? 8Jan 12, 2022 3:35 pm Just to add to this we have been in our new home now in Perth for 12 months. It is 320m2 total, 230m2 living, normal WA construction colourbond roof but with full anticon insulation under the roof plus insulation batts on the ceiling. Our AC is a 14kw cooling ducted Fujitsu unit and during summer it cools the entire house easily even on the couple of 40deg days we had over Christmas. I dont usually need to turn it on until 1 pm and it usually is turned off around 8pm. Our 6.6kw solar system offsets the running costs during the day. We also have heavy drapes on most windows that are closed on the really hot days.
Re: Trick in the contract by Dale Alcock? 9Jan 28, 2022 5:56 pm Our new build is 285sqm of living area (not including garage) and they've included a 20kw system. You talk about deletions, are they variations or PS and PC adjustments? pleas list them 1 12009 Are you saying that these consultants are involved at key-points of the building, and perform site inspects at the stages, or only after building is completed to point… 4 8991 i wouldn't be worried, you'll definitely miss something, no matter how many times you review. we've spent close to 5 months ensuring everything got reflected in the… 5 9441 |